|
The photograph shows the underside of part of the Lupu Bridge over the Huangpu River in Shanghai, China. |
ACA were commissioned by SCX Special Projects Ltd. to provide a full structural analysis of the bridge cleaning gantry which is under slung from the central section of the bridge. ACA were also involved in the mechanical design and analysis of the motive components of the bridge, enabling the horizontal section of the bridge to be cleaned in a continuous action. |
|
|
|
ACA Engineering Consultants, 4a Main Road, Gedling, Nottingham NG4 3HP
Telephone (+44) 0115 9533931 Email: |
|